Reservoir construction has eliminated mains water use

Wycombe Heights Golf Centre

England

Written by: Christopher Sharp

2022 saw record-high temperatures throughout the UK, bringing with it extreme drought conditions. Luckily, the timely completion of our 10,000m³ reservoir meant that the irrigated surfaces didn't suffer.

The new reservoir has also allowed us to utilise the borehole to its full potential. Previously we were operating at approximately 80% mains water, 20% borehole. This has now changed to 100% borehole.

Irrigation is currently present on greens and tees, however, with this new sustainable water source we will be extending the system to the approaches.

Tell your story

Share Your Highlight Now