Written by: Wiel Janssen
2024
During the routine annual maintenance of the GCM clubhouse, a minor roof leakage was detected. To address this issue, GCM opted to redirect the water from the roofs into pebble beds located at the front and back of the building.
This proactive step aligns with the Continuous Improvement Plan (CIP) already in place.