Written by: Jonathan Palmer
2025
Construction of an energy-efficient course maintenance facility which included heat pump technology to supply the space heating and hot water requirements. 48 PV panels were installed on the roof with a peak kilowatt output of 15 kW/hour. The combined results of which have reduced our carbon footprint and generated savings in our energy costs.