2024
To conserve water, the club is planning to construct a 4,000 sqm dam to capture water from nearby sources, supplementing the existing lake. The dam is expected to hold 12,000 cubic meters of water, with an estimated daily savings of 1,000 cubic meters during the dry months of December, January, and February. This could result in an annual cost savings of approximately Php 3,870,000.
Additionally, the club will upgrade to the Cirrus Pro Central irrigation control system, ensuring precise water distribution. A weather station will also be installed to optimize water usage based on real-time data.
For now, the club is supplied by three deep wells.
The project is currently in the design phase, with completion targeted for the summer of 2025.